Off-Site Integration With a Textured Paint Finish at Colmore Plaza, Birmingham
30th June 2008
|
Off-site prefabrication from SAS International was specified for the exciting new Colmore Plaza office development in Birmingham. Aedas Architects and the project development team, Abstract Securities, specified System 330 with SAS FT, a fine textured paint finish, for the ceilings for Phase 1 of this prestigious Class A office building.
Apertures for luminaires and other services are factory formed reducing on site wastage and installation time. However for this project a prefabricated solution was specified by the M&E Consultants with air diffusers factory integrated into the tile. This facilitated the speed and ease of installation, and created build efficiencies for the fit-out of the initial office suites.
Click here to view case study. File size: 0.78mb |
|
Haga clic aquí para obtener más información
CPD (Cursos de Desarrollo Profesional Continuo) disponibles: haga clic aquí para obtener más información.
